Sydney Region

  • North West Bus Transitway - construction of a shared use path along the southern side of George Street from Boys Avenue to Sunnyholt Road, Blacktown. Construction of a shared use path along the eastern side of Sunnyholt Road from Devitt Street to Vardys Road, Kings Park. Construction of a shared use path along the north-western side of Sunnyholt Road from Candlenut Grove to Old Windsor Road, Parklea.
  • Lane Cove Tunnel - construction of 4.0 metre wide concrete separated/shared use path along the southern side of Epping Road from Mowbray Road to Pacific Highway, Lane Cove.
  • Bexley North to Cup and Saucer Creek - construction of an on-road cycleway along Lundy Avenue, Poole Street, Woorail Avenue, Miller Street, Dunkirk Avenue, Hilltop Street, William Street, Alfred Street, Jarret Street and Northcote Street from the M5 East cycleway at Lundy Street, Kingsgrove to the Cup and Saucer Creek cycleway, Earlwood.
  • Great Western Highway, Leura to Katoomba section 2 - construction of sealed shoulders along both sides of the Great Western Highway between East View Avenue, Leura and Bowling Green Avenue, Katoomba. Construction of a shared use path along the northern side of the Great Western Highway from East View Avenue, Leura to Bowling Green Avenue, Katoomba.

The following projects are council based and details are available by contacting the relevant project officer at the following councils:

  • Bankstown - construction of a shared use path along the eastern foreshore of the Georges River from Tower Road, Bankstown Airport to No.384 Henry Lawson Drive, Milperra - includes an underpass of Newbridge Road/Milperra Bridge.
  • Blacktown - construction of a shared use path along the eastern side of Lalor Creek from Northcott Road, Lalor Park through Ashley Brown Reserve, crossing to the western side via the bridge at the Kennedy Parade access and then along the western edge of the Ashley Brown Reserve to Cacia Avenue. Installation of an on-road cycleway along Cacia Avenue from Ashley Brown Reserve to Quinn Avenue. Construction of a shared use path along the southern side of Quinn Avenue from Cacia Avenue to Lucas Road. Construction of a shared use path along the eastern side of Lucas Road from Quinn Avenue to Prospect Highway, Seven Hills.
  • Blue Mountains - installation of road shoulders along both sides of Hat Hill Road from Connaught Road to the end of the road seal, Blackheath. Installation of road shoulders along both sides of Govetts Leap Road from the Great Western Highway to the Blue Mountains National Park, Blackheath.  Installation of road shoulder along both sides of Hat Hill Road from the Great Western Highway to Connaught Road, Blackheath. Construction of a shared use path along the southern side of the Great Western Highway from the Mt Victoria Public School to Station Street. Installation of road shoulders along both sides of Station Street from the Great Western Highway to Mount Victoria Railway Station, Mount Victoria.
  • Camden - construction of a shared use path along the south eastern side of Camden Valley Way from the western boundary of Camden Golf Club (Studley Park), over Rheinberger's Hill, to the existing northern extent of the the path within Kirkham Park, Camden.
  • Campbelltown – stage 2 construction of a shared use path through the Ambarvale Sports Complex from Therry Road to Copperfield Drive, Ambarvale.
  • Fairfield - construction of a shared use path along the north western foreshore of Chipping Norton Lake, south eastern side of Silverwater Crescent, from opposite Fairlawn Close to Cutler Road, Lansvale.
  • Hawkesbury – construction of sealed shoulders along the northern side of Terrace Road from the existing sealed shoulder approximately 300 metres east of Wire Lane. Construction of sealed shoulders along the southern side of Terrace Road from the existing sealed shoulder at Wire Lane, Freemans Reach. Installation of hand railing adjacent to the cycleway along Wilberforce Road from Windsor Bridge to Freemans Reach Road, Windsor.
  • Ku-ring-gai - installation of continuous road shoulders along both sides of Bobbin Head Road from Boomerang Street to Nambucca Street, Turramurra.
  • Leichhardt – installation of road shoulders along both sides of Johnston Street from Parramatta Road to The Crescent, Annandale.
  • Liverpool - construction of a shared use path along the eastern side of Brickmakers Creek, through Amalfi Park, from the Boundary Road pathway bridge to the Graham Avenue intersection with Chrysanthemum Avenue, Lurnea. Installation of an on-road cycleway along Fitzpatrick Crescent, De Meyrick Avenue, and Chrysanthemum Avenue from Jardine Park, Casula to Amalfi Memorial Park, Lurnea.
  • Mosman – provision of a shared use path through the road closure at the end of Wudgong Street and along the southern side of Military Road from Wudgong Street to Cardinal Street, Mosman. Construction of a shared use path through The Spit Reserve, west of Spit Road, from Pearl Bay Avenue to the Spit Bridge, Mosman.
  • Parramatta - construction of a shared use path along the northern foreshore of the Parramatta River 1) the missing link in the South Street to Allen Street section through the Rheem Car Park, Rydalmere. Completion of the Eric Primrose Reserve pathway upgrade through to the Thackeray Street Bridge, Rydalmere.
  • Pittwater - construction of a shared use path along the eastern side of Garden Street from Powderworks Road to opposite its intersection with The Crescent, North Narrabeen.
  • Randwick – construction and installation of on-road and off-road cycleways between Clovelly and La Perouse. Construction of a shared use path through Pioneer Park, Malabar.
  • Rockdale - installation of Bicycle Parking at Rockdale Railway Station - Railway Street, Rockdale.
  • Ryde – Upgrading of the existing pathway to a shared use path along the north eastern side of Bridge Road between Shrimptons Creek and the Bridge Road crossing, North Ryde. Upgrading of the existing footbridge located in Flinders Park, north of Bridge Road, to a shared use bridge, North Ryde.
  • Sutherland - construction of a shared use path along the eastern side of Mitchell Road and Marine Esplande from opposite Bando Road to Murdock Street, Cronulla.
  • Warringah - construction of a shared use path along the southern foreshore of Curl Curl Lagoon from the end of the existing shared path network at Park Street to the shared path along the western side of Griffin Road, Curl Curl.
  • Willoughby - construction of a shared use path along the eastern side of Hampden Road from Brand Street to the Hampden Road/Burra Road railway underpass. Installation of road shoulders along both sides of Hampden Road and Herbert Street from Brand Street, Artarmon to the Pacific Highway, St Leonards.
  • Woollahra - installation of mixed traffic lanes along both sides of New McLean Street, Cameron Street and Thorn Street (includes a shared use path between New McLean Street and the cul-de-sac end of Cameron Street) from New South Head Road to Jersey Road, Edgecliff. Construction of shared use paths, split pairs - one-way for bicycles only, along both sides of Victoria Road from Old South Head Road to Bellevue Park Road between New McLean Street and the cul-de-sac end of Cameron Street, Bellevue Hill. Mixed traffic lane, east to southbound only, along Fern Place. Installation/construction of a shared use path (north eastbound bicycles only) along the north western side of Old South Head Road from Fern Place to Edgecliff Road, Edgecliff. Installation of an on-road cycleway along Hopetoun Road from New South Head Road to Old South Head Road, Vaucluse.