Southern region

Northern Distributor extension – Wollongong

NDE (looking north)

Both directions of the $110 million Northern Distributor extension have been opened to traffic. Thousands of Illawarrra residents took part in a community walk on Sunday 29 November 2009, along the Northern Distributor extension, from Molloy Street, Bulli to Park Road, Woonona, to celebrate the opening of the southbound carriageway of the project.

The southbound carriageway was opened to traffic at the conclusion of the event.

Project benefits

The new four lane divided road provides improved travel times and access to the northern suburbs of Wollongong. It also reduces congestion on local roads.

Cyclists are able to use the new 2.5 metre sealed shoulders where they can enjoy a smooth and safe ride.

The 3km extension also includes an overpass at Campbell Street, underpass at Park Road and new traffic signals to provide access to York Road near Alice Street.

There is also improved safety and access around the Woonona Shopping Centre with less through traffic in the area.

NDE (looking south) NDE (facing south) NDE (looking north) towards Campbell Street NDE (looking north) NDE (looking south) towards Campbell Road NDE (looking south) November 2009 community walk day Looking south from Molloy Street, Bulli Looking south from Molloy Street, Bulli Looking south from Farrell Road pedestrian bridge Campbell Street bridge Looking south from Campbell Street Bridge NDE looking north from Bellambi Lane Campbell Street Bridge The Northern Distributor Extension at the Princes Highway, Bulli NDE looking south from the Princes Highway, Bulli
Looking south east from the Molloy Street roundabout along NDE Panoramic view looking south on the NDE Looking south from the Thompson Street extension The Northern Distributor joins the new extension, looking north from Bellambi Lane Excavation of Park Road cutting Bridge over Campbell Street Looking south east from the new Molloy St roundabout along NDE Farrell Road pedestrian bridge (looking west) Retaining walls for bridge over Campbell Street Extension of Thompson St to Park Rd and Gray St to Park Rd traffic diversion (looking West) Commencing excavation for Park Rd overbridge (looking west) New intersection with York Rd and bridge over Farrahar’s Creek (looking west) New bridges over local creeks near Terania St (looking west) Connecting southbound carriageway to existing Northern Distributor at Bellambi Lane (looking West) Looking north along NDE (panoramic view) from Bellambi Excavation for cutting at Park Rd (looking east) Farrell Road pedestrian bridge (looking east) Northern end of NDE showing new intersection at Hospital Rd and new Molloy St roundabout (looking north) Looking south along NDE (panoramic view) from Bulli