Sydney Harbour Bridge precinct

Strengthening

Sydney Harbour Bridge  

The Sydney Harbour Bridge has recently undergone an $85 million improvement and upgrade to extend its lifespan indefinitely.

This project was funded by the NSW Government, with the works designed to:

  • Safely upgrade one of the world's great steel bridges.
  • Ensure there were no significant changes to the visual identity of the bridge.
  • Minimise disruption to motorists and commuters.

Temporary work platforms, painted in the Harbour Bridge's 'bridge grey', were constructed along the length of the bridge to provide unique construction access. This custom built equipment will now be stored for re-use whenever required. These structures for now will be disassembled.

Roads and Maritime Services (formerly Roads and Traffic Authority) constructed a new plaza under the bridge to improve Bradfield Park. An area that was essentially dirt with poor drainage has been transformed with a lowered plaza area, landscaping and seating. New fencing was installed to ensure cyclists and pedestrians could not access the railway tracks or the roadway.

The upgrade work was completed in 2010. We thank residents for their patience during this construction period.

Bradfield Plaza 

 

 

 Strengthening animation - structures and temporary work platforms 

Watch Sydney Harbour Bridge upgrade animation

Watch an animation of the upgrade to existing Sydney Harbour Bridge structures and temporary work platforms (duration: 60 seconds, file size 2MB).

 

 Strengthening animation - structures and temporary work platforms birds eye view.  

Watch Sydney Harbour Bridge upgrade animation

Watch an animation of the upgrade to existing Sydney Harbour Bridge structures and temporary work platforms birds eye view. (duration: 15 seconds, file size 1MB).

 Strengthening animation - structures and temporary work platforms view from road 

Watch Sydney Harbour Bridge upgrade animation

Watch an animation of the upgrade to existing Sydney Harbour Bridge structures and temporary work platforms view from the road (duration: 15 seconds, file size 883 KB).

 

NOTE: TO VIEW THE VIDEO YOU WILL NEED FLASH 8 OR ABOVE. To download the latest Adobe Flash player click here.

Videos are best viewed with a high speed (broadband) Internet connection. Users with a lower speed connection (dial-up) may experience delays when viewing videos.

Further information

Please contact Roads and Maritime Services (formerly Roads and Traffic Authority) asset manager, Peter Mann on 02 9255 3469 or email Sydney_Harbour_Bridge_projects@rta.nsw.gov.au

Please note, email will be acknowledged and responses will be provided as per correspondence to Roads and Maritime Services (formerly Roads and Traffic Authority).