Kempsey Bypass project documents
RMS Road Projects website strives where possible to ensure all documents comply with WCAG 2.0. If you are having trouble accessing information in a document, please contact us on Project_Customer_Services@rms.nsw.gov.au.
To open or download documents, 'right-click' on the title for PC and 'control-click' on the title for Mac and choose an option. Get more help with downloading and viewing documents
Community information material
-
Letters and notifications
File Date Description File Size PDFFeedback form March 2013 Naming of the Macleay River and Floodplain Bridge. 84KB DOCFeedback form March 2013 Naming of the Macleay River and Floodplain Bridge. 362KB PDFProposed change to work hours March 2013 Proposed night time out of hours work and extension of working hours. 125KB DOCProposed change to work hours March 2013 Proposed night time out of hours work and extension of working hours. 277KB PDFChanged traffic conditions at South Kempsey October 2012 A temporary traffic switch scheduled to take place at South Kempsey on Wednesday 31 October 2012, weather permitting. 156KB PDFChanged traffic conditions at South Kempsey October 2012 A temporary traffic switch scheduled to take place at South Kempsey on Wednesday 31 October 2012, weather permitting with details for local residents of Kemps Road and Old Coast Road. 210KB PDFProposed change to Saturday work hours August 2012 The Kempsey bypass project is proposing to conduct work each Saturday (weather permitting) between the hours of 8am and 5pm until 15 December 2012. 183KB PDFOutside of hours night work July 2012 South West Rocks Road Girder Erection is scheduled to occur on Wednesday 18 and Thursday 19 July 2012, between 9pm and 5am. 163KB PDFOutside of hours night work June 2012 Concrete pouring and saw cutting of the new road pavement is scheduled to take place between Pola Creek and Old Station Road for approximately two weeks from Friday 29 June 2012. 97KB PDFOutside of hours work – Tie-in of new interchange at Great North Road Frederickton March 2012 Work is scheduled to occur continuously between 6pm on Friday 23 March and 7am on Monday 26 March 2012 (weather permitting). 220KB PDFOut of hours work February 2012 Work on the Kempsey bypass is progressing with concrete pouring and saw cutting of the new road pavement scheduled to start in March 2012 and continue until the end of December 2012. 285KB PDFCommunity information session presentation February 2012 Presentation delivered at the Community information session on Wednesday 29 February. 3MB PDFOutside of hours work – Saw cutting at Frederickton interchange December 2011 This work is scheduled to occur as required from Monday 9 January to Tuesday 31 January 2012, between 6pm and 7am (weather permitting). 148KB PDFKempsey bypass batch plant establishment December 2011 Establishment of a new concrete batch plant at 247 Old Station Road, Verges Creek is proposed to start in the coming weeks and commence operation in early 2012, weather permitting. 100KB PDFNorth Coast Railway Line bridge beam delivery September 2011 Beams will be delivered and placed on the bridge abutment for the new North Coast Railway Line overpass On Saturday 24 and Sunday 25 September 2011, between 8am and 5pm. 128KB PDFOutside hours work, vegetation clearing at South Kempsey August 2011 Vegetation clearing is required adjacent to the existing Pacific Highway at South Kempsey on Saturday 13 August 2011, between 8am and 5pm. 128KB PDFOut of hours works being carried out August 2011 Changed traffic conditions for Pacific Highway at South Kempsey. 32KB PDFMacleay River and floodplain bridge, start bridge piling July 2011 Bridge piling works for the Macleay River floodplain bridge started on 18 July 2011. 376KB PDFMacleay River and floodplain bridge, start temporary rock platform July 2011 Two temporary rock platforms will be built in the river to provide stable platform from which the bridge can be built. 229KB PDFProposed change to Saturday work hours June 2011 Householder letter seeking comment from community regarding a proposed change to Saturday work hours. 59KB PDFEstablish site compound for the bridge construction work April 2011 Householder letter about the establishment of a site compound for Abigroup, to enable the construction of the Macleay River and floodplain bridge. 464KB PDFTraffic switch at South Kempsey May 2011 Householder letter about the closure of southbound travel lanes between Kempsey Squash Centre and Kemps Road. 99KB PDFOut of hours work at Crescent Head Road April 2011 Householder letter about the out of hours work required for the Crescent Head Road bridge beam placement. 243KB PDFYablseys Lane pug mill and asphalt plant April 2011 Householder letter about the establishment of a pug mill and asphalt plant at Yabsleys Lane site compound. 199KB PDFFrederickton boat ramp concept design April 2011 Concept design for the Frederickton boat ramp. 100KB PDFUrban design and landscaping plan March 2011 Householder letter about the display of the urban design and landscaping plan. 79KB PDFConstruction of Frederickton levee March 2011 A levee will be constructed along the bank of the Macleay River at Lawson Street and the Pacific Highway, Frederickton. 548KB PDFCommunity information sessions March 2011 March 2011 Community information sessions March 2011. 86KB PDFOperational noise information sessions February 2011 Operational noise information sessions February 2011. 86KB PDFBlasting notification January 2011 Controlled blasting between the Pacific Highway at South Kempsey to the North Coast Railway Line. 74KB PDFFrederickton construction update December 2010 December 2010 Frederickton construction update December 2010. 106KB PDFControlled blasting information session notification September 2010 Controlled blasting North Coast Railway Line to Crescent Head Road, information session in Kempsey on 27 September 2010. 88KB PDFKempsey bypass controlled blasting North Coast Railway Line to Crescent Head Road September 2010 Kempsey bypass controlled blasting North Coast Railway Line to Crescent Head Road (20 September 2010). 105KB PDFKempsey bypass - blasting information sheet September 2010 Kempsey bypass - blasting information sheet (September 2010). 121KB PDFRealignment of Bruces Lane and Crescent Head Road Intersection September 2010 Realignment of Bruces Lane and Crescent Head Road Intersection (September 2010). 103KB PDFTraffic changes to Crescent Head Road August 2010 Traffic changes at Crescent Head Road from 30 August 2010 to late 2011. 108KB PDFKempsey bypass permanent project site compound, Yabsleys Lane July 2010 Kempsey bypass permanent project site compound, Yabsleys Lane (July 2010). 122KB PDFConstruction of site access gates at Frederickton June 2010 Householder letter about the construction of site access gates at Frederickton. 189KB PDFVegetation removal and installation of project boundary fencing June 2010 Vegetation removal and installation of project boundary fencing (June 2010). 117KB PDFKempsey bypass project - construction of site access gates at Verges Creek June 2010 Kempsey bypass project - construction of site access gates at Verges Creek (June 2010). 218KB PDFKempsey bypass project - construction of site access gates at South Kempsey June 2010 Kempsey bypass project - construction of site access gates at South Kempsey (June 2010). 231KB PDFPermanent site office establishment flyer April 2010 Permanent site office establishment flyer (April 2010). 106KB PDFSite office relocation flyer February 2010 Site office relocation flyer (February 2010). 219KB -
Advertisements
File Date Description File Size PDFQuarterly construction update, June to August 2011 June 2011 Proposed construction activities between June to August 2011. 52KB PDFTraffic switch at South Kempsey May 2011 Advertisement about the closure of southbound travel lanes between Kempsey Squash Centre and Kemps Road. 50KB PDFQuarterly construction update, March to May 2011 March 2011 Update on the project construction activities. 63KB PDFCommunity information session March 2011 March 2011 Community information session March 2011. 86KB PDFNoise information sessions February 2011 February 2011 Noise information sessions February 2011. 56KB PDFQuarterly construction update, December 2010 to January 2011 December 2010 Update on project construction activities. 65KB PDFQuarterly construction update, September 2010 to November 2010 September 2010 Update on project construction activities. 53KB PDFAdvertisement 13, July 2010, Construction Update July 2010 Advertisement 13, July 2010, Construction Update. 46KB PDFAdvertisement 12, August 2008, Project approval August 2008 Advertisement 12, August 2008, Project approval. 25KB PDFAdvertisement 11, March 2008, Submissions report March 2008 Advertisement 11, March 2008, Submissions report. 32KB PDFAdvertisement 10, January 2007, Community update January 2007 Advertisement 10, January 2007, Community update. 36KB PDFAdvertisement 9, August 2006, Part 3A project application August 2006 Advertisement 9, August 2006, Part 3A project application. 48KB PDFAdvertisement 8, January 2005, Community liaison groups January 2005 Advertisement 8, January 2005, Community liaison groups. 116KB PDFAdvertisement 7, July 2004, Preferred route at East Kempsey and Collombatti July 2004 Advertisement 7, July 2004, Preferred route at East Kempsey and Collombatti. 173KB PDFAdvertisement 6, December 2003, Eastern route option and sub-options December 2003 Advertisement 6, December 2003, Eastern route option and sub-options. 72KB PDFAdvertisement 5, November 2002, Flooding and agricultural issues workshop November 2002 Advertisement 5, November 2002, Flooding and agricultural issues workshop. 235KB PDFAdvertisement 4, October 2002, Route Options October 2002 Advertisement 4, October 2002, Route Options. 616KB PDFAdvertisement 3, December 2001, Changes to the study area and keeping the community informed December 2001 Advertisement 3, December 2001, Changes to the study area and keeping the community informed. 184KB PDFAdvertisement 2, October 2001, Nominations for the community focus group October 2001 Advertisement 2, October 2001, Nominations for the community focus group. 190KB PDFAdvertisement 1, October 2001, Community information evening October 2001 Advertisement 1, October 2001, Community information evening. 33KB -
Media releases
File Date Description File Size PDFChange to project weekend work hours July 2011 Weekend work on the Kempsey bypass, with the exception of the Macleay River and floodplain bridge, has been limited to one Saturday per month after considering feedback from the local community. 37KB PDFChanged traffic conditions on Old Station Road and Inches Road May 2011 Traffic alert about the changed traffic conditions that will occur on Old Station Road and Inches roads from Saturday 21 May 2011. Released on 18 May 2011. 37KB PDFTraffic switch at South Kempsey May 2011 Traffic alert about the closure of southbound travel lanes between Kempsey Squash Centre and Kemps Road released 5 May 2011. 30KB PDFSouth Kempsey traffic changes marks bypass progress April 2011 Media release about the closure of southbound travel lanes between Kempsey Squash Centre and Kemps Road released 28 April 2011. 27KB PDFCommunity information sessions March 2011 Community information sessions March 2011. 33KB PDFMedia release, Noise information sessions February 2011 Kempsey bypass community information session regarding noise mitigation. 32KB PDFMedia release, Ferry Lane memorial avenue January 2011 Information to the community on Ferry Lane memorial avenue. 73KB -
Construction updates
File Date Description File Size PDFConstruction update March to April 2013 March 2013 Construction update March to April 2013. 109KB DOCConstruction update March to April 2013 March 2013 Construction update March to April 2013. 164KB PDFConstruction update January to February 2013 February 2013 Construction update January to February 2013. 104KB DOCConstruction update January to February 2013 February 2013 Construction update January to February 2013. 162KB PDFConstruction update September to October 2012 September 2012 Construction update September to October 2012 229KB PDFConstruction update July to August 2012 July 2012 Construction update July to August 2012. 158KB PDFConstruction update May to June 2012 April 2012 Construction update May to June 2012. 110KB PDFConstruction update March to April 2012 March 2012 Construction update March to April 2012. 292KB PDFConstruction update November to December 2011 November 2011 Construction update November to December 2011. 284KB PDFConstruction update September to October 2011 October 2011 Construction update September to October 2011 151KB PDFConstruction update July to August 2011 July 2011 Construction update July to August 2011. 223KB PDFConstruction update May to June 2011 May 2011 Construction update May to June 2011. 237KB PDFConstruction update March to April 2011 March 2011 Construction update March to April 2011. 253KB -
Community updates
File Date Description File Size PDFProject opening brochure March 2013 Kempsey Bypass project opening brochure. 2MB PDFJuly 2010 design refinement community update July 2010 This community update describes proposed design refinements to Kempsey bypass project. 5MB PDFCommunity update 9, July 2007 July 2007 Community update 9, July 2007. 2MB PDFCommunity update 8, January 2007 January 2007 Community update 8, January 2007. 100KB PDFCommunity update 7, February 2006 February 2006 Community update 7, February 2006. 458KB PDFCommunity update 6, February 2005 February 2005 Community update 6, February 2005. 2MB PDFCommunity update 5, July 2004 July 2004 Community update 5, July 2004. 252KB PDFCommunity update 4, December 2003 December 2003 Community update 4, December 2003. 1004KB PDFCommunity update 3, June 2003 June 2003 Community update 3, June 2003. 235KB PDFCommunity update 2, October 2002 October 2002 Community update 2, October 2002. 685KB PDFCommunity update 1, October 2001 October 2001 Community update 1, October 2001. 446KB -
Information and displays
File Date Description File Size PDFKempsey bypass project displays August 2011 Kempsey bypass project displays. 5MB PDFKempsey bypass community information session July 2011 Kempsey bypass community information session presentation, Thursday 21 July 2011. 6MB PDFKempsey bypass map May 2011 Kempsey bypass map. 2MB PDFUrban design and landscaping management plan June 2011 Urban design and landscaping management plan for the Kempsey bypass project. Available to the community to view and make comment until Friday 15 April 2011. 17MB PDFUrban design and landscaping management presentation March 2011 Overview of the urban design and landscaping management plan. 418KB PDFCommunity information session presentation March 2011 Community information session presentation March 2011. 4MB PDFNoise presentation February 2011 Noise presentation February 2011. 3MB PDFKempsey bypass Controlled blasting presentation October 2010 Kempsey bypass Controlled blasting presentation. 395KB PDFKempsey Bypass map October 2010 Kempsey Bypass map. 2MB PDFChanged traffic conditions on Crescent Head Road October 2010 Changed traffic conditions on Crescent Head Road in the week commencing 25 October 2010. 27KB
Information sessions and focus groups notes
-
Flood group meetings
File Date Description File Size PDFKempsey bypass flood focus group meeting, 21 June 2011 June 2011 Kempsey bypass, flood focus group meeting presentation and meeting notes. 95KB PDFKempsey Bypass flood reference group meeting 18 May 2010 May 2010 Kempsey Bypass flood reference group meeting 18 May 2010. 88KB PDFFlood group meeting notes 4, December 2005 December 2005 Flood group meeting notes 4, December 2005. 31KB PDFFlood group meeting notes 3, July 2005 July 2005 Flood group meeting notes 3, July 2005. 73KB PDFFlood group meeting notes 2, May 2005 May 2005 Flood group meeting notes 2, May 2005. 57KB PDFFlood group meeting notes 1, April 2005 April 2005 Flood group meeting notes 1, April 2005. 102KB -
Community Focus Group Meetings
File Date Description File Size PDFCommunity focus group meeting notes 9, March 2003 March 2003 Community focus group meeting notes 9, March 2003 98KB PDFCommunity focus group meeting notes 8, December 2002 December 2002 Community focus group meeting notes 8, December 2002 130KB PDFCommunity focus group meeting notes 7, October 2002 October 2002 Community focus group meeting notes 7, October 2002 66KB PDFCommunity focus group meeting notes 6, May 2002 March 2002 Community focus group meeting notes 6, May 2002 147KB PDFCommunity focus group meeting notes 5, March 2002 March 2002 Community focus group meeting notes 5, March 2002 101KB PDFCommunity focus group meeting notes 4, February 2002 February 2002 Community focus group meeting notes 4, February 2002 111KB PDFCommunity focus group meeting notes 3, December 2001 December 2001 Community focus group meeting notes 3, December 2001 95KB PDFCommunity focus group meeting notes 2, November 2001 November 2001 Community focus group meeting notes 2, November 2001 83KB PDFCommunity focus group meeting notes 1, October 2001 October 2001 Community focus group meeting notes 1, October 2001 53KB -
Community Information Sessions
File Date Description File Size PDFMeeting notes, September 2001 September 2001 Meeting notes, September 2001 19KB -
Community Liaison Group Meetings
File Date Description File Size PDFSouth Kempsey, December 2005 December 2005 South Kempsey, December 2005 25KB PDFSouth Kempsey, April 2005 April 2005 South Kempsey, April 2005 48KB PDFCrescent Head Road/Inches Road, December 2005 December 2005 Crescent Head Road/Inches Road, December 2005 27KB PDFCrescent Head Road/Inches Road, April 2005 April 2005 Crescent Head Road/Inches Road, April 2005 57KB PDFFrogmore/Macleay River floodplain, December 2005 December 2005 Frogmore/Macleay River floodplain, December 2005 30KB PDFFrogmore/Macleay River floodplain, April 2005 April 2005 Frogmore/Macleay River floodplain, April 2005 51KB PDFFrederickton, December 2005 December 2005 Frederickton, December 2005 30KB PDFFrederickton, April 2005 April 2005 Frederickton, April 2005 55KB
Submission Report
-
Submission Report
File Date Description File Size PDFMain report March 2008 Main report 406KB PDFAppendix A March 2008 Appendix A 80KB PDFAppendix B, Part 1 March 2008 Appendix B, Part 1 2MB PDFAppendix B, Part 2 March 2008 Appendix B, Part 2 430KB PDFAppendix B, Part 3 March 2008 Appendix B, Part 3 3MB PDFAppendix B, Part 4 March 2008 Appendix B, Part 4 5MB PDFAppendix B, Part 5 March 2008 Appendix B, Part 5 5MB PDFAppendix B, Part 6 March 2008 Appendix B, Part 6 5MB PDFAppendix C March 2008 Appendix C 126KB
Conditions of Approval
-
Conditions of Approval
File Date Description File Size PDFEnvironment protection licence December 2011 Environmental Protection Licence - updated December 2011. 225KB PDFConstruction compliance tracking report December 2010 Six monthly construction compliance tracking report, June 2010 to December 2010. 6MB PDFSigned instrument of modification two November 2010 Signed instrument of modification two. 162KB PDFModification 2 application October 2010 Request for modification to conditions of approval, Kempsey to Eungai. 10MB PDFEnvironment protection licence May 2010 Environment protection licence. 226KB PDFCompliance tracking program April 2010 Compliance tracking program. 244KB PDFSigned instrument of modification one March 2010 Signed instrument of modification one. 221KB PDFModification 1 application February 2010 Request for modification to conditions of approval, Kempsey to Eungai. 914KB PDFRequirements for Environmental assessment September 2008 Requirements for Environmental Assessment Kempsey to Eungai. 363KB PDFEnvironmental Assessment Report July 2008 Environmental Assessment Report, Kempsey to Eungai. 491KB PDFConsolidated conditions of approval July 2008 Consolidated conditions of approval. 121KB
Construction Compliance Report
-
Construction Compliance Report
File Date Description File Size PDFSix monthly Construction Compliance report August 2011 22 December 2010 to 21 June 2011. 2MB
CEMP Documents
-
CEMP Documents
File Date Description File Size PDFConstruction environmental management plan August 2011 Construction environmental management plan. 4MB PDFConstruction environmental management plan May 2011 Macleay River and Floodplain Bridges construction environmental management plan. 7MB PDFAppendix 1 - Flora fauna management plan May 2010 Appendix 1 - Flora fauna management plan 3MB PDFAppendix 2 - Heritage management plan January 2011 Appendix 2 - Heritage management plan 2MB PDFAppendix 3 - Noise vibration management plan May 2011 Appendix 3 - Noise vibration management plan 988KB PDFAppendix 4 - Air quality management plan March 2011 Appendix 4 - Air quality management plan 2MB PDFAppendix 5 - Soil water management plan March 2011 Appendix 5 - Soil water management plan 4MB PDFAppendix 6 - Acid sulfate soil management plan March 2011 Appendix 6 - Acid sulfate soil management plan 2MB PDFAppendix 7- Waste energy management_plan March 2011 Appendix 7- Waste energy management_plan 370KB PDFConstruction environmental management plan May 2010 Construction environmental management plan 2MB
Permits
-
Permits
File Date Description File Size PDFWater Extraction Permit June 2011 Water Extraction Permit Macleay River. 182KB PDFWater Extraction Permit June 2011 Water Extraction Permit Yabsley Dam. 194KB PDFWater Extraction Permit December 2010 Water Extraction Permit Pola Creek. 430KB PDFWater Extraction Permit December 2010 Water Extraction Permit Bull Creek. 430KB
Environmental Assessment - Volume 1
-
Environmental Assessment - Volume 1
File Date Description File Size PDFCover and table of contents July 2007 Cover and table of contents 528KB PDFGlossary and abbreviations July 2007 Glossary and abbreviations 35KB PDFExecutive summary July 2007 Executive summary 30KB -
Part A – Introduction and need for the proposal
File Date Description File Size PDFChapter 1 – Introduction July 2007 Chapter 1 – Introduction 460KB PDFChapter 2 – Context and need for the proposed upgrade July 2007 Chapter 2 – Context and need for the proposed upgrade 482KB PDFChapter 3 – Planning and approvals July 2007 Chapter 3 – Planning and approvals 63KB PDFChapter 4 – Community and stakeholder involvement July 2007 Chapter 4 – Community and stakeholder involvement 636KB -
Part B – Route selection and design development
File Date Description File Size PDFChapter 5 – Approach to route selection and design July 2007 Chapter 5 – Approach to route selection and design 15MB -
Part C – The proposal
File Date Description File Size PDFChapter 6 – Concept design July 2007 Chapter 6 – Concept design 14MB PDFChapter 7 – Refinement of design and construction July 2007 Chapter 7 – Refinement of design and construction 3MB PDFChapter 8 – Environmental management July 2007 Chapter 8 – Environmental management 34KB -
Part D – Environmental assessment
File Date Description File Size PDFChapter 9 – Environmental risk analysis July 2007 Chapter 9 – Environmental risk analysis 44KB PDFChapter 10 – Hydrology and water management July 2007 Chapter 10 – Hydrology and water management 2MB PDFChapter 11 – Biodiversity July 2007 Chapter 11 – Biodiversity 11MB PDFChapter 12 – Geology and soils July 2007 Chapter 12 – Geology and soils 1010KB PDFChapter 13 – Hazard and risk July 2007 Chapter 13 – Hazard and risk 134KB PDFChapter 14 – Traffic transportation and access July 2007 Chapter 14 – Traffic transportation and access 4MB PDFChapter 15 – Land use and property July 2007 Chapter 15 – Land use and property 7MB PDFChapter 16 – Noise and vibration July 2007 Chapter 16 – Noise and vibration 14MB PDFChapter 17 – Heritage July 2007 Chapter 17 – Heritage 672KB PDFChapter 18 – Socio–economic impacts July 2007 Chapter 18 – Socio–economic impacts 252KB PDFChapter 19 – Landscape and visual impacts July 2007 Chapter 19 – Landscape and visual impacts 12MB PDFChapter 20 – Air quality July 2007 Chapter 20 – Air quality 57KB PDFChapter 21 – Other environmental issues July 2007 Chapter 21 – Other environmental issues 81KB -
Part E – Justification and conclusions
File Date Description File Size PDFChapter – 22 Justification and conclusions July 2007 Chapter – 22 Justification and conclusions 70KB PDFReferences July 2007 References 41KB -
Appendices
File Date Description File Size PDFAppendix A – Director-General's EA requirements July 2007 Appendix A – Director-General's EA requirements 813KB PDFAppendix B – Check list of key issues July 2007 Appendix B – Check list of key issues 39KB PDFAppendix C – Summary of issues raised during consultation July 2007 Appendix C – Summary of issues raised during consultation 99KB PDFAppendix D – Draft statement of commitments July 2007 Appendix D – Draft statement of commitments 86KB PDFAppendix E – Roads and Maritime Services (formerly Roads and Traffic Authority) land acquisition policy July 2007 Appendix E – Roads and Maritime Services (formerly Roads and Traffic Authority) land acquisition policy 3MB PDFAppendix F – Subsurface investigations for archaelogical deposits July 2007 Appendix F – Subsurface investigations for archaelogical deposits 31KB PDFAppendix G – Study team July 2007 Appendix G – Study team 39KB
Environmental Assessment - Volume 2
-
Environmental Assessment - Volume 2
File Date Description File Size PDFCover July 2007 Cover 397KB PDFTechnical report 1 – Supplementary Flooding Report July 2007 Technical report 1 – Supplementary Flooding Report 19MB PDFTechnical report 2 – Supplementary Ecological Assessment July 2007 Technical report 2 – Supplementary Ecological Assessment 19MB PDFTechnical report 3 – Noise and Vibration Assessment July 2007 Technical report 3 – Noise and Vibration Assessment 27MB PDFTechnical report 4 – Climate and Air Quality Assessment July 2007 Technical report 4 – Climate and Air Quality Assessment 656KB PDFTechnical report 5 – Heritage Assessment July 2007 Technical report 5 – Heritage Assessment 5MB
Other Reports
-
Other Reports
File Date Description File Size PDFOperational Noise Mitigation Assessment June 2011 Operational Noise Mitigation Assessment 9MB PDFFlood Impact Assessment Report December 2012 Flood Impact Assessment Report . 8MB PDFFerry Lane Management Plan November 2010 Ferry Lane Management Plan Kempsey Bypass. 10MB PDFEcological Monitoring Program June 2010 Ecological Monitoring Program: Kempsey Bypass project. 493KB PDFKempsey to Eungai Staging report April 2010 Kempsey to Eungai Staging report. 487KB PDFKempsey to Eungai Upgrade Proposed Biodiversity Offset and Mitigation Strategy April 2010 Kempsey to Eungai Upgrade Proposed Biodiversity Offset and Mitigation Strategy. 347KB PDFKempsey to Eungai Part 3A Project Application Report July 2006 Kempsey to Eungai Part 3A Project Application Report. 17MB PDFKempsey to Eungai Part 3A Project Application Report, (Supporting Information - Ecological Assessment) July 2006 Kempsey to Eungai Part 3A Project Application Report, (Supporting Information - Ecological Assessment). 9MB PDFKempsey to Eungai Part 3A Project Application Report, (Supporting Information - Flooding Investigations Report), July 2006 July 2006 Kempsey to Eungai Part 3A Project Application Report, (Supporting Information - Flooding Investigations Report) 50MB PDFPreferred Route Option Flooding Report July 2004 Preferred Route Option Flooding Report. 39MB PDFPreferred Route Options Report July 2004 Preferred Route Options Report. 17MB
Employment application forms
-
Employment application forms
File Date Description File Size DOCSalary employment application February 2010 Salary employment application 171KB DOCWages employment application February 2010 Wages employment application 236KB
Explore our projects
- Home
- Projects
- Alpha-numeric route numbers
- Building Sydney's Motorways
- Bus priority program
- Central Coast region
- Great Western Highway
- Hunter region
- Maintenance
- Northern region
- Pacific Highway upgrade
- Permanent Variable Message Signs
- Pinch point program
- Princes Highway upgrade
- South West region
- Southern region
- Sydney Harbour Bridge precinct
- Sydney region
- The Hunter Expressway
- Western region