Bicycle Projects

South West region

For the 2010/11 financial year these bicycle provisions are being made in the following projects:

Balranald

  • Euston Bike Plan Stage 2 - construction of a shared use path through Crown Land from Tyrrel Street to the Euston Weir, Euston.

Cootamundra

  • Upgrading (installation of signs, markings and handrails) and widening of the existing refuge crossing of Wallendoon Street on the northwestern side of Thompson Street, Cootamundra.

Corowa

  • Construction of a shared use path along 1) the Corowa-Culcairn Railway Corridor from Bow Street to Bullecourt Road - includes a link to the Whitehead Street Wetlands nature reserve; 2) Bullecourt Road from the Corowa-Culcairn Railway corridor to Honour Avenue; 3) Honour Avenue from Bullecourt Road to Federation Way; 4) and Federation Way from Honour Avenue to the Victorian Border, Corowa.

Deniliquin

  • Beach to Beach stage 4 - construction of a shared use path along the southwestern side of the Edward River from the National Bridge (Davidson Street (Cobb Highway)) to the bottom of the ramp on Edwardes Street.

Greater Hume

  • Construction of a shared use path along the south side of Holbrook Road from Cemetery Road to Federal Street, Culcairn.
  • Construction of a shared use path along the western side of Allan Street from Keightley Street to Rosler Parade, linking the shopping centre, swimming pool/tennis facilities and Community Centre, Henty.

Gundagai - Stage16

  • Construction of a shared use path along the east side of Virgil Street from the eastern end of the existing path at the Sheridan Lane Flour Mill to Sheridan Street, Gundagai.

Harden

  • Construction of a shared use path along the northern side of Smith Street from Station Street to Killick Avenue, Harden.

Jerilderie

  • Construction of a shared use path along the southern side of Coreen Street from Kennedy St (Catholic School) to Wood Street, Jerilderie.

Junee

  • Construction of a shared use path along 1) the western side of Loughan Road from the southern end of the existing path to 13/1035451; 2) across 13/1035451 and along the access between 17/811541 and 2/1035454 from Loughan Road to De Salis Drive/Smythe Road; & 3) the western side of the 13/1035451 to Gwynne Place, Junee.

Leeton

  • Construction of a shared use path along the southwestern side of Acacia Avenue West from Oak Street to Dunn Avenue, Leeton.

Lockhart

  • Construction of a shared use path along the north side of Green Street from Hayes Street to the Council Chambers (half way between Day Street and Mathews Street), Lockhart.

Murray

  • Construction of a shared use path along the western side of Twenty Four Lane from Pericoota Road to Mayfield Court, Moama.
  • Construction of a shared use path along the southern side of Picnic Point Road from the Tarragon Bridge for 1.7km towards Mathoura.

Murrumbidgee

  • Construction of a shared use path through the reserve from the Lions Park to the existing Sandpiper Street Drainage Reserve path, Coleambally.

Narrandera

  • 1) Delineation of a road shoulder along both sides of Jonsen Street from Whitton Street to Victoria Avenue, Narrandera; and 2) construction of a shared use path along the western side of Adams Street from the Narrandera Pre School to Whitton Street, Narrandera.

Temora

  • Construction of a shared use path along 1) the northern side of Kitchener Road from Barmedman Road (Kidman Way) to Trungley Road; and 2) the western side of Trungley Road from Kitchener Road to Deutcher Street, Temora.

Tumbarumba

  • Construction of a shared use path along the southern side of Mitchell Avenue and the eastern side of Scott Street from the Khancoban rose garden to Alpine Way, Khancoban.

Tumut

  • Project 7 - construction of a shared use path through Apex Park (between Lynch Street and the Tumut Bowling Club) from Campbell Street to Neill Street, Adelong.

Urana

  • Stage 1/2 - construction of a shared use path along the eastern side of Coreen Street from Milthorpe Street to Thornber Street, Oaklands.

Wagga Wagga

  • Construction of a shared sue path along the southern side of Farrer Road from Boorooma Street to Coolamon Road, Boorooma.

Wakool

  • Construction of a shared use path from the Moulamein Historical Court House to the Recreational Reserve, Moulamein.

Yass Valley - stage 2

  • Construction of a shared use path along the Hume Street road reserve from the northern extent of the path from the Yass River Warrammballulah Crossing to the intersection of Grampian Street/Hume Street, Yass.

Young

  • Construction of a shared use path along the western side of the Olympic Highway and northern side of Hennessy Street from Cunich Street to Thornhill Street, Young