Roads and Traffic Authority, N S W text image
Construction of Gladesville Bridge - Sound files
Home > Environment > Downloads > Construction of Gladesville Bridge - Sound files

Construction of the Gladesville Bridge - Sound files

Summary

Selected interview excerpts from the compilation CD.

To open or download documents, 'right-click' on the title for PC and 'control-click' on the title for Mac and choose an option.
Help with downloading and viewing files

Part 1 - Early history/The old Gladesville Bridge
TYPE TITLE SIZE PAGES
multimedia MP3 5.29Mb
multimedia Real Media 332Kb
Part 2 - The DMR's road network vision/The DMR as an organisation
TYPE TITLE SIZE PAGES
multimedia MP3
multimedia Real Media 289Kb
Part 3 - Design, planning and structural analysis of the new bridge
TYPE TITLE SIZE PAGES
multimedia MP3 8.02Mb
multimedia Real Media 504Kb
Part 4 - Demolition and excavation/Effect on adjoining suburbs
TYPE TITLE SIZE PAGES
multimedia MP3 2.81Mb
multimedia Real Media 178Kb
Part 5 - The workforce: labourers, crane drivers and dogmen
TYPE TITLE SIZE PAGES
multimedia MP3 3.91Mb
multimedia Real Media 247Kb
Part 6 - Surveying the bridge/Pile driving/The Titan crane
TYPE TITLE SIZE PAGES
multimedia MP3 4.97Mb
multimedia Real Media 313Kb
Part 7 - Casting of the box units/Concrete testing laboratory
TYPE TITLE SIZE PAGES
multimedia MP3
multimedia Real Media 283Kb
Part 8 - The fog room/Concrete test cylinder 'failure'
TYPE TITLE SIZE PAGES
multimedia MP3 1.99Mb
multimedia Real Media 126Kb
Part 9 - Concrete problems solved/The making of the film/Site safety
TYPE TITLE SIZE PAGES
multimedia MP3 6.39Mb
multimedia Real Media 401Kb
Part 10 - Workplace and construction accidents/Tanker collision
TYPE TITLE SIZE PAGES
multimedia MP3 4.99Mb
multimedia Real Media 313Kb
Part 11 - Jacking the arch
TYPE TITLE SIZE PAGES
multimedia MP3 6.77Mb
multimedia Real Media 426Kb
Part 12 - Stressing; stretching cables/Adding headstocks, deck and railings/Relations with unions
TYPE TITLE SIZE PAGES
multimedia MP3 5.79Mb
multimedia Real Media 364Kb
Part 13 - The Bridge Opening
TYPE TITLE SIZE PAGES
multimedia MP3 3.88Mb
multimedia Real Media 244Kb
Part 14 - Adding an extra lane/Concrete creep
TYPE TITLE SIZE PAGES
multimedia MP3 2.64Mb
multimedia Real Media 166Kb
Part 15 - Lifespan and maintenance of the bridge/Construction of Fig Tree and Tarban Creek bridges
TYPE TITLE SIZE PAGES
multimedia MP3 3.45Mb
multimedia Real Media 217Kb
Part 16 - Accidents/Wind/Significance of the bridge/Final observations
TYPE TITLE SIZE PAGES
multimedia MP3 5.85Mb
multimedia Real Media 368Kb
RTA Oral History Program