Roads and Traffic Authority, N S W text image
Sturt Highway to Holbrook
Home > Construction and maintenance > Regional projects > South West > Hume Highway duplication package > Sturt Highway to Holbrook
In This Section

Barton Highway

Coolac Bypass

Corowa bridges

Replacement of Adelong Creek bridges

Sheahan Bridge duplication

Wymah Ferry review

Albury Wodonga Hume Freeway project

Hume Highway duplication package

> Sturt Highway to Holbrook

> Sturt Highway to Table Top

> Sturt Highway to Tarcutta

> Kyeamba Hill

> Little Billabong

> Yarra Yarra to Holbrook

> Woomargama to Mullengandra

> Sydney-Melbourne Corridor strategy

Murray River bridges


Sturt Highway to Holbrook

The Minister for Planning approved conditions of approval for four sections of the Hume Highway duplication worksfrom Sturt Highway to Holbrook on the 25 July 2007 The conditions include requirements for monitoring, assessment, reporting and consultation when undertaking works. These conditions also include monitoring and compliance requirements for noise and vibration during construction and provide guidance on the processes required for community involvement and environmental management.

In accordance with the project’s conditions of approval, a range of Environmental Management Plans have been prepared for the construction phase of the project. These plans detail the environmental safeguards that will be implemented during the course of the project construction. The plans also include the mitigation measures to be implemented to manage the potential environmental impacts that construction works may have on the surrounding environment.

The conditions of approval and Environmental Management Plans for the Hume Highway duplication between the Sturt Highway and Holbrook are available to view or download from the link at the bottom of this page.

As a condition of approval requirement, outcomes of compliance monitoring and tracking will be made available as the project progresses.  An initial report outlining progress is available to view or download from the link box at the bottom of this page.

Further Information

For project information or to make a complaint please contact the Northern Hume Alliance team:

Free call:  1800 066 350
Fax: 9218 9685
Email:  community@nha.inCITE.com.au
Post: Northern Hume Alliance 84-88 Murray Street Wagga Wagga NSW 2650

Files

Construction Environmental Management Plan

The Northern Hume Alliance (NHA) has developed this Construction Environmental Management Plan (N829-EN-201) (CEMP) for implementation during the Hume Highway Duplication – Sturt Highway to Holbrook Project (the Project).

Construction Flora and Fauna Management Plan

Sturt Highway to Holbrook Construction Flora and Fauna Management Plan

Construction Heritage Management Plan

Construction Heritage Management Plan

Construction Noise and Vibration Management Plan

Hume Highway Duplication – Sturt Highway to Holbrook Construction Noise and Vibration Management Plan

Construction Riparian Management Plan

Hume Highway Duplication – Sturt Highway to Holbrook Construction Riparian Management Plan

Construction Traffic Management Plan

Hume Highway Duplication – Sturt Highway to Holbrook Construction Traffic Management Plan

Dust Management Plan

Hume Highway Duplication – Sturt Highway to Holbrook Dust Management Plan

Conditions of approval

Hume Highway Duplication – Conditions of approval and Instrument for Concept Plan


Back to top