Roads and Traffic Authority, N S W text image
Northern Distributor extension
Home > Construction and maintenance > Regional projects > Southern > Northern Distributor extension
In This Section

Bega Bypass

Bulli intersection upgrade

Conjola Mountain

Hume Highway

Hume Highway - Marulan

Kings Highway

Main Road 92 Upgrade

Northern Distributor extension

> Photo gallery

Picton Road

Princes Highway safety improvements

Princes Highway upgrade - Gerringong to Bomaderry

Princes Highway upgrade - South Nowra

Princes Highway upgrade at Victoria Creek

Upgrade of Lanyon Drive

Oak Flats to Dunmore


Northern Distributor extension – Wollongong

Northern Distributor community walk route

You are invited to a community walk on Sunday 29 November 2009.

Illawarrra residents are invited to a community walk along the $110 million Northern Distributor extension, from Molloy Street, Bulli to Park Road, Woonona, to celebrate the opening of the southbound carriageway of the project.

The 2km walk begins at 10.45am at Molloy Street, Bulli and finishes at Park Road Bridge, Woonona. Travel to Bulli by train, the start of the event is a short walk from Bulli Railway Station (see map).

There is no parking provided at the event. At the conclusion of the walk, you are invited to take part in a community fun day at the Circle Shopping Centre on Park Road, Woonona.

Refreshments and free activities for all the family include:

  • Jumping castles
  • Face painting
  • Balloon sculpting

Return to Bulli via the foot path alongside the Northern Distributor extension or board a train at Woonona Railway Station, located next to the Circle Shopping Centre.

You should commence the walk no later than 12.30pm.

Traffic update

The southbound carriageway will be opened to traffic at the conclusion of the event on Sunday 29 November.

Work will continue on the rest of the extension, which is expected to open to traffic by the end of 2009, weather permitting.

Project benefits

The new four lane divided road will improve travel times and access to the northern suburbs of Wollongong. It will also reduce congestion on local roads.

Cyclists will be able to use the new 2.5 metre sealed shoulders so they can enjoy a smooth and safe ride.

The 3km extension also includes an overpass at Campbell Street, underpass at Park Road and new traffic signals to provide access to York Road near Alice Street.

There will also be improved safety and access around the Woonona Shopping Centre with less through traffic in the area.

Construction hours

Construction hours are Monday to Friday from 7am to 6pm and Saturday from 8am to 1pm. Some work may be required outside these hours however residents and motorists will be given advanced notification. Work may change due to weather and other considerations.

For project related information from the RTA:

1800 633 332 (option 4) (during business hours)
Email:   NDE@rta.nsw.gov.au 
Website: www.rta.nsw.gov.au

Northern Distributor Extension
PO Box 477
Wollongong 2520

Visit the display centre:

RTA site office (opposite the Hospital Road intersection), Princes Highway, Bulli.

Further information

For further information about construction activities phone: 1800 074 588

Files

Community walk invitation

You are invited to a community walk on Sunday 29 November 2009.

Community liaison group

A forum for discussion and exchange of information on topics related to the construction phase of the Northern Distributor extension.

Community updates (August 2009)

Community updates on the Northern Distributor extension between Bellambi and Bulli.

Conditions of approval (2004)

The Northern Distributor Extension received planning approval on 6 July 2004, subject to 82 conditions.

Preferred Activity Report

The Preferred Activity Report consists of the Proposal as described in the Wollongong Northern Distributor Extension Environmental Impact Statement (EIS), subject to the proposed modifications and inclusive of all proposed environmental mitigation measures, controls and commitments.

Artist impression (2007)

An artist's impression of the proposed modification of the Northern Distributor extension, Wollongong.

Environmental Impact Statement

The RTA propsal to extend the Northern Distributor through northern suburbs of Wollongong from Bellambi Lane to rejoin the Princes Highway at Molloy Street at Bulli.


Back to top

Northern Distributor Extension, Wollongong