Roads and Traffic Authority, N S W text image
3D Visualisation
Home > Construction and maintenance > Regional projects > Pacific Highway upgrade > Banora Point upgrade > 3D Visualisation
In This Section

Banora Point upgrade

> 3D Visualisation

> Development process

> Public information

> Preferred concept

> Community and stakeholder involvement

> Environmental assessment

> Contact us

> DEWHA referral

Inland Corridor alternative to the Pacific Highway

Program objectives

Process to upgrade the highway

Managing the environment

Weekly road conditions

Contact us


3D Visualisation

Click on the links below to view the proposed upgrade alignment. Videos are best viewed with a high speed (broadband) internet connection. Users with a lower speed connection (dial-up) may experience delays when viewing the videos.

Disclaimer: These visualisations are an animated representation of the proposed Banora Point upgrade. It shows the current concept design for the Proposal and the general nature only of existing adjacent features.

Fly-through and drive-through videos

View the flyover: Meandering - Banora Point upgrade (no audio)
Meandering (19.1Mb)

Click on the link above to launch the Banora Point upgrade flyover (duration: 3:02 minutes).

View the drive-through: North-South drive through - Banora Point upgrade (no audio)
North to South (12.8Mb)

Click on the link above to launch the Banora Point upgrade drive through (duration: 2:06 minutes).

View the drive-through: South-North drive through - Banora Point upgrade (no audio)
South to North (12.5Mb)

Click on the link above to launch the Banora Point upgrade drive through (duration: 2:01 minutes).

View the drive-through: Minjungbal to Darlington drive through - Banora Point upgrade (no audio)
Minjungbal to Darlington (12.4Mb)

Click on the link above to launch the Banora Point upgrade drive through (duration: 1:59 minutes).

Back to top