Roads and Traffic Authority, N S W text image
Environmental review
Home > Construction and maintenance > Downloads > Environmental review
Realignment of the Princes Highway between Oak Flats and Dunmore Modified Design of the interchange at MR522 and Princes Highway Environmental Review

Realignment of the Princes Highway between Oak Flats and Dunmore Environmental review

Summary

The proposed new highway will be a four lane divided carriageway, with a grade separated interchange linked to Shellharbour Road. Shellharbour Road will also be upgraded to four lanes matching the remainder of its link to Wollongong.

To open or download documents, 'right-click' on the title for PC and 'control-click' on the title for Mac and choose an option.
Help with downloading and viewing files

Decision report
TYPE TITLE SIZE PAGES
pdf Decision report 286Kb 24
Environmental review
TYPE TITLE SIZE PAGES
pdf 1. Introduction and background 315Kb 7
pdf 2. The Approved Project 199Kb 5
pdf 3. Time Lapse Considerations 318Kb 4
pdf 4. Reassessment of the Approved Project Inclusive of Modifications 209Kb 28
pdf 5. Amended conditions of approval 78.9Kb 10
pdf 6 Consideration of Environmental Factors 54.4Kb 6
Appendices
TYPE TITLE SIZE PAGES
pdf Appendix A - Background Database Searches 16.96Mb 15
pdf Appendix B - Updated Noise Impact Assessment 1.86Mb 87
pdf Appendix C - Supplementary Visual Assessment 4.82Mb 48
Realignment of the Princes Highway between Oak Flats and Dunmore Modified Design of the interchange at MR522 and Princes Highway