Roads and Traffic Authority, N S W text image
Planned CCT surface traffic modifications 2006
Home > Construction and maintenance > Downloads > Planned CCT surface traffic modifications 2006

Planned Cross City Tunnel surface traffic modifications June 2006

Summary

The NSW Premier, Morris Iemma, announced planned changes to surface streets associated with the Cross City Tunnel project on 4 June 2006. This report addresses the environmental assessment of proposed modifications to the Cross City Tunnel project.
The report was prepared by the RTA and has been submitted to the Director-General of NSW Department of Planning for the Minister for Planning’s approval.

To open or download documents, 'right-click' on the title for PC and 'control-click' on the title for Mac and choose an option.
Help with downloading and viewing files

Report
TYPE TITLE SIZE PAGES
pdf Cross City Tunnel surface traffic modifications (main body) 149Kb 41
pdf Appendix A – relevant figures 2.36Mb 8
pdf Appendix B – illustrations of proposed modifications 2.21Mb 8
pdf Appendix C – proposed modification of approval conditions 54.9Kb 4
pdf Appendix D – operational traffic assessment 185Kb 21
pdf Appendix E – noise assessment 146Kb 34
pdf Appendix F – approved urban design of Queens Cross works 71.6Kb 2
Cross City Tunnel Surface Traffic Changes - Final Modification Report June 2006 download page